Modern amenities in the new classroom building will include drinking fountains (pictured at right) designed for the easy filling of reusable bottles. A photo gallery of the construction also includes a peak at some of the complex plumbing involved in the geothermal heating and cooling system.
The building is being constructed to be consistent with Leadership in Energy and Environmental Design green building standards.