Posted in Planning & Assessment on May 21st, 2008
The results are in from Illinois Wesleyan University’s TechQual+ survey of student perceptions of technology services. The radar chart to the left is from the Survey Results report. Red indicates areas needing improvement.
You can download the “2008 Student Survey Results” and the “2008 Student Survey Analysis” from the reports section of the IT website. The [...]
Read Full Post »
Posted in Planning & Assessment on May 13th, 2008
Each year Illinois Wesleyan University’s office of Information Technology prepares a summary report on the state of technology services at the University. The 2008 IT Summary Report looks at “accomplishments, challenges, and opportunities”.
You can download the “2008 Summary Report” from the IT Reports web page.
Read Full Post »
Posted in Operations on May 7th, 2008
Illinois Wesleyan University does allow gaming on the campus network. The staff of the office of Information Technology can help resolve problems with network games as our staff time and the University’s Internet bandwidth allow. If you are having performance problem playing a game on the campus network, please call the IT Help Desk at [...]
Read Full Post »
Posted in Operations on May 2nd, 2008
There will be a number of construction projects starting on campus after commencement. Among these projects will be projects to extend the campus voice, video and data networks. The sites that will have this work include:
The new Welcome Center
The Presidents House
Adams Hall will connect directly to the campus, rather than the current wireless bridge
Harriet House [...]
Read Full Post »